Programs

Leadership · Facilitator-led

Risk Radar

Risk research, board report and crisis rehearsal

Four research reports, one guided document and two simulations, assigned by a manager or governance lead. Research and the document are built around the unit's own situation, and each simulation around the participant's role and seniority. Unlimited attempts.

7 rooms · about 2 hours 15 min

Overview

The problem this solves

A leader who owns risk for a business unit is answerable for what they did not see coming: the rule that changed, the supplier that failed, the risk that arrived in the afternoon with half the facts. This program prepares them through research, one document and simulation. Ren researches the unit's market, regulation, supply and political exposure from named sources and writes a sourced report on each, builds a board report from what the leader states, and then plays every person in the two scenes that test the leader when a risk lands and when the register is challenged.

Leaders work on their own, as often as they want. Every report carries a confidence rating on every section, so the leader knows how much weight a finding will bear. The board report returns a document a risk committee can read. The two simulations are scored on the same dimensions every time, benchmarked for the leader's level, and returned with the moments that earned the score and one recommended focus. Every attempt builds their trajectory. The manager reads the reports and the scores as they land, brings a gap to the regular one-to-one, and sees the team's pattern once three have finished a simulation.

Why they use it

Leaders

  • Get a sourced, rated view of the risks their unit carries, rule by rule and supplier by supplier.
  • Turn the findings into a register they own, with a signal to watch on every row, and a board report built from it.
  • Rehearse the risk arriving and the register being challenged before either happens, with a score for every dimension and the moment that earned it.

Managers and risk leads

  • See each leader's register and reports as they complete them, with the confidence rating beside each finding.
  • Bring a gap to the next one-to-one when it appears, then watch the next attempt to see whether it moved.
  • Read the team's pattern once three have finished a simulation, and know where the group reads risk late.

How it works

Four of the seven rooms are research reports. The leader tells Ren what the unit is: its industry and sub-sector, its region and countries, the inputs it cannot operate without, and their own role. Ren researches from named sources and writes a sourced report with a confidence rating on every section; the leader provides context only. The four reports cover the unit's market, its regulation, its supply chain and its political exposure. After each report the leader writes the register rows it supports.

The fifth room is a document. In Board Report the leader is the source: Ren takes the period, the KPIs, where things are off-plan, the decisions requested and the material risks from the register, presses on a vague answer, and builds the report as the leader answers. Ren does no research for this room, and it is not scored.

The last two rooms are simulations built for the person in them. In Crisis Decision Ren takes the leader's role and seniority, the industry context and the type of crisis, which is the top risk on their register, and builds it around them: the triggering event lands, updates arrive incomplete and contradict each other, the people with a stake press for different things, and a trade-off arrives before the close. In Presentation Under Pressure Ren builds the room the register goes to, with a member who has already formed a view, and plays the audience as the leader defends it.

When a scene closes, Ren writes the report. Each dimension is scored from 0 to 100 against a published rubric and tied to a moment in the scene that earned it; section 2 lists the dimensions. Every simulation report also carries what worked, the risk signals, strengths, development areas, blind spots where the evidence shows them, one recommended focus with a first step and a thirty-day signal, and an intelligence brief.

A leader can retake a simulation as often as they want; every attempt is scored on the same dimensions, and the report charts the trajectory across all of them. A research report re-run later is a new, dated report; the difference between the two is what moved in the world.

The manager sees all of it: each report and document as it completes, a Ren summary of each leader across every room they have finished, the trajectory on every retaken simulation, and, once three leaders have finished a simulation, a team report. The manager raises a gap in the next one-to-one and watches the following attempt. The program asks nothing of the manager beyond that. The reports inform the development conversation and the next attempt. They are never an appraisal input.

Who it's for

Leaders and managers answerable for the risks a business unit carries, from first-time heads of function to country heads.

Leaders and managers who are answerable for the risks a business unit carries: general managers, country heads, heads of operations, supply chain, compliance or finance, and the product-line heads who report risk upward. It is assigned by their manager, a risk or governance lead or a facilitator; the manager's lines are for whoever that is. Every research room takes the unit's own market, countries and inputs, and every simulation calibrates to role and seniority, so one cohort can hold a country head and a first-time head of function. It assumes participants know their unit.

Room by room

Seven rooms, in order, each alone with Ren. The manager's line is what to read before the one-to-one.

Room 1

Risk Assessment

Objective

Get an evidenced, rated view of the risks facing the unit's market, and open the register with the ones already materialising.

The room

Set-up: the industry, the sub-sector, the region and the participant's role. Ren researches from named sources and writes the report: the specific risks facing this market right now, evidenced, rated by likelihood and impact, with the signals to watch and the mitigations available, and a confidence rating on every section.

Participant activity

  • Run the room. Name the market the way the unit's customers would.
  • Read the materialising risks first. Each one goes on the register before the next room with its source and its confidence rating.
  • Read the signals to watch. For each of the top five risks, write down the one signal the leader could check monthly.

Manager

Read the materialising risks and the confidence rating on each, and the register's first rows. Ask which risk the leader would have said was covered before the report, and whether the report agreed.

Output

One report and a register with its first rows, dated.

Room 2

Regulatory Risk

Objective

Know which rules are about to change, how enforcement is moving, and what that does to the register.

The room

Set-up: the industry, the sub-sector, the region, the specific countries and the participant's role. Ren researches from named sources and writes the report: pending legislation, enforcement trends, compliance exposure, and where the rules are likely to change, with a confidence rating on every section. The enforcement picture differs by country, so the leader names them all.

Participant activity

  • Run the room, with every country the unit sells in, sources from or is regulated in named.
  • Read the pending legislation against the register. Some rows from room 1 now have a date attached; write it in.
  • Read the enforcement trends, then add the regulatory rows, each with its signal: a consultation deadline, a bill stage or an enforcement action.

Manager

Read the pending legislation and the enforcement trends, and check which rows from room 1 now carry a date. Where a compliance lead disagrees with a finding, have the leader note both views. Ask which rule the leader would brief the board on first.

Output

One report, the register updated with dates and regulatory rows.

Room 3

Supply Chain Risk

Objective

Name the single points of failure in the unit's inputs and the concentrations that would hurt if they broke.

The room

Set-up: the industry, the sub-sector, the inputs of concern, the region and the participant's role. Ren researches from named sources and writes the report: input dependencies, single-source exposure, concentration risks and trade-route vulnerabilities for this market, with a confidence rating on every section.

Participant activity

  • Run the room. Name the inputs the unit cannot operate without, and where each comes from.
  • Read the single-source exposures first. Every single source is a register row with an owner.
  • Read the concentration risks and the trade-route vulnerabilities against the rows from room 2. An export control or a due-diligence rule may already be on the register under a different name; merge them.

Manager

Read the single-source exposures and check every one is a register row with an owner. Ask for the one supply risk the leader would have said was covered. Read the Ren summary across the three rooms so far.

Output

One report, the register updated with supply rows and owners.

Room 4

Geopolitical Risks

Objective

Understand the political exposure of every country the unit depends on, and read the register as a whole for the first time.

The room

Set-up: the region, the specific countries, the industry exposure and the participant's role. Ren researches from named sources and writes the report: government stability, policy direction, international relations and what is changing, with a confidence rating on every section. The leader names every country, including the ones that only host a supplier or a customer.

Participant activity

  • Run the room, with every country named.
  • Read policy direction and what is changing against the register's regulatory rows. A pending rule with an election before it is a different risk.
  • Add the political rows, most as watch items with a signal and a review date, then flag the ten rows on the register that matter most.

Manager

Read what is changing, country by country, and the register as a whole with the leader's top ten. Ask which country the unit is most exposed to and what would show it getting worse. Agree the one focus for the second half.

Output

One report, the register complete in draft, and one focus chosen for the second half.

Room 5

Board Report

Objective

Rate, own and sign the register, then put it in front of the board or the risk committee in one document the leader built.

The room

Set-up: the period being reported, the company stage and context, the board's composition (who is on it and their relevant networks or sectors), the headline KPIs, where things are off-plan, the decisions requested from the board, and the material risks the board should know. Ren does no research for this room. The leader is the source; Ren works section by section, presses on a vague answer or a risk with no owner before moving on, and builds the document as the leader answers. There is no score.

Participant activity

  • Before opening the room, finish the register: rate every row, move the low-rated rows to a watch list with a review date, give every active row a named owner, and write one line of mitigation for the top ten.
  • Run the room with the register and the period's numbers to hand. The material risks are the top ten; a mitigation that needs money goes under decisions requested.
  • Read Material Risks and Decisions Requested first, and check each material risk against its register row.
  • Share the document with the board or the committee.

Manager

Read Material Risks and Decisions Requested, and check each material risk matches its register row. Compare the new register with the old one where there was one. Ask which decision requested the leader expects to be refused, and what they will do then.

Output

One document, shared; the register rated, owned and signed.

Room 6

Crisis Decision

Objective

Decide when the top risk arrives with incomplete information and escalate at the right moment.

The room

Calibration: the leader's role and seniority, the industry context, and the type of crisis, which is the top-rated risk on the register that could arrive fast: a supplier failure, a regulatory probe, a political shock. Ren builds the crisis around the leader's role and plays every person in it. The triggering event lands. Updates arrive with gaps, and the next one contradicts the last. The people with a stake, each with a name and a reason, want a different answer and say so. The leader decides what to do first, who to tell and when to go up the line, and before the close a trade-off arrives that costs something either way.

Participant activity

  • Run the room on the top risk from the register.
  • Read Escalation Decision first: who they went to, when, and what that timing reveals. Then Communication: how clearly they told people while it moved.
  • Re-read the register row for that risk. Where the scene showed the mitigation would not have worked, change it.

Manager

Read Escalation Decision and Communication, and ask when they would have gone up the line.

Output

One report and the top risk's row revised.

Room 7

Presentation Under Pressure

Objective

Defend the register to a room that has already formed a view.

The room

Calibration: role title, the audience (a single senior stakeholder, the board, the executive committee or a hostile external audience), the industry or sector and a line of working context, with the organisation's website as an option. Ren builds the room and the people in it: defending a proposal to a board member who already has a view, presenting results to an executive committee with a sceptic on it, or presenting bad news and taking the questions. The leader brings the board report from room 5 and opens. The audience interrupts, doubts the evidence, and puts the question the leader least wants.

Participant activity

  • Write the first two sentences before opening the room. Run it in voice.
  • Read Lead Argument first: whether the material risks came first, or were buried in the KPIs. Then Question Response and Poise: which question landed hardest, and how they held.
  • Rework the opening minute and say it aloud once more.

Manager

Read Question Response and Poise, and ask which question they would least want in the real room. Read the team report. Set the ongoing plan: one room a month, and the quarter the research rooms are re-run.

Output

One report and the ongoing plan.

Outcomes

Program outputs

  • Four sourced reports on the unit's market, regulatory, supply chain and political exposure, with a confidence rating on every section, and a register the leader owns
  • A board report built from the leader's own register: the material risks, the exceptions and the decisions requested
  • A scored report after each simulation with the moment that earned each score, a trajectory across every attempt, and for the manager a Ren summary of each leader and a team report
  • Scored against published frameworks: Boyd's OODA loop, Klein's recognition-primed decision-making, crisis communication discipline, the Minto pyramid principle and Aristotelian rhetoric; the reports rest on named, cited sources

Participant outcomes

  • Four sourced reports on the unit's own market, regulatory, supply and political exposure, with a confidence rating on every section
  • A risk register the leader owns: every row with a source, a rating, a signal to watch, an owner and the confidence the source supports
  • A board report built from the register, ready for a board or a group risk committee
  • A scored report after each simulation with the moment that earned each score, and unlimited attempts, each a new scene, charted against every attempt before it

Manager and facilitator outcomes

  • Four reports, one board report and two scored scenes per leader in the first cycle, completed in their own time
  • Each leader's register and reports as they complete them, and a Ren summary of each leader, ready for the one-to-one
  • Gaps identified as they appear, and the next attempt showing whether the gap moved
  • A team report once three leaders have finished a simulation, which is the debrief agenda when a facilitator runs it
  • For a facilitator running it for a client: the registers, the board reports, the Ren summaries and the trajectories, as the evidence for what the client's leaders need next

What the participant can do by the end of the first cycle

  1. Name the risks that matter most to their unit right now, each with a source, the confidence it supports, and the signal that would show it getting closer.
  2. Name the rule that is about to change, the enforcement trend behind it, and what it does to the unit's compliance exposure.
  3. Name the unit's single-source inputs and concentrations, and the trade route each depends on.
  4. Say which country the unit is most exposed to politically, what is changing there, and when.
  5. Put the material risks, the exceptions and the decisions requested in front of a board in one document they built themselves.
  6. Decide when the top risk arrives with incomplete information, escalate at the right moment, and tell the people it affects.
  7. Defend the register to a board member who has already formed a view, and hold ground without becoming defensive.

Business measures

MeasureFirst attemptEnd of first cycleOngoing
Register rows with a named owner and a signal to watchCount, usually 0Every active rowReviewed monthly
Crisis Decision overall scoreFirst attemptStrong (70 or above) on the latest attemptMaintained or rising on the quarterly attempt
Crisis Decision, Escalation Decision scoreFirst attemptUp on the latest attemptStrong
Presentation Under Pressure, Question Response scoreFirst attemptDeveloping or aboveStrong
Your confidence that this leader sees risk coming (1 to 5)First rating4 or above4 or above

Scoring

How Renatus fits

Four rooms are research reports, one is a document and two are simulations. A research room returns a sourced report with a confidence rating on every section; it carries no score. The document room is built from what the leader states, pressure-tested by Ren, and carries no score. Each simulation scores four or five dimensions from 0 to 100, and the overall score is the mean. Strong is 70 and above, Developing is 30 to 69, Emerging is below 30. Both simulations show how each dimension compares with a reference benchmark for the participant's level.

The organisation sets the context

Upload your values, procedures, frameworks and policies at set-up. Ren applies them in every room, along with current governmental policies. Three layers carry the context: program memory for every program, session memory for one session, product memory for each individual product. Ren also carries each participant's earlier results into the next. You decide what your people rehearse.

The research rooms take the unit as the leader describes it

Each report starts from what the leader names: the industry and sub-sector, the region, the countries, the inputs of concern and their role. Where the sources are thin, the confidence rating says so, and the register should carry that rating beside the row.

Board Report is built from what the leader states

Ren does no research for this room. The leader is the source, Ren pressure-tests each answer, and the document builds section by section. Section 5 lists the seven things it takes.

One room looks things up as it goes

Presentation Under Pressure looks up current public information on the fly when it matters to the scene, and does not store it.

Attempts

A room can be retaken as often as the participant wants. They open their earlier report and choose New Attempt; Ren re-asks calibration, draws a scene for their current role and level, and the new report is scored on the same dimensions and charts the trajectory across every attempt. A fresh run from the room's start page would produce an unlinked report with no trajectory. A research room re-run is a new, dated report to set beside the last.

Voice

Every simulation runs in text or voice. Run Presentation Under Pressure in voice; how a leader sounds when the evidence is doubted is part of what Poise scores.

Your view

In My Programs you can read each participant's reports, a Ren summary of each participant across the rooms they have finished, the trajectory on every retaken room, and the team report once three have finished a room. A participant can run every room in their own language; Ren's evaluation and the summary come to you in yours. Open it before every one-to-one. A falling line on a room a participant has done well before is the earliest warning you will get.

The rooms in program order:

Risk Assessment Research

Risk Assessment

Assess the specific risks facing your unit's market right now, evidenced, rated by likelihood and impact, with the signals to watch and the mitigations available. Ren researches from named sources.

Scores no dimension; the report carries a confidence rating on every section and rests on named, cited sources.

Regulatory Risk Research

Regulatory Risk

Assess the pending legislation, enforcement trends and compliance exposure in your unit's countries, and where the rules are likely to change. Ren researches from named sources.

Scores no dimension; the report carries a confidence rating on every section and rests on named, cited sources.

Supply Chain Risk Research

Supply Chain Risk

Assess the input dependencies, single-source exposure, concentration risks and trade-route vulnerabilities behind what your unit cannot operate without. Ren researches from named sources.

Scores no dimension; the report carries a confidence rating on every section and rests on named, cited sources.

Geopolitical Risks Research

Geopolitical Risks

Assess the political exposure of the countries your unit depends on: government stability, policy direction, international relations, and what is changing. Ren researches from named sources.

Scores no dimension; the report carries a confidence rating on every section and rests on named, cited sources.

Board Report Framework

Board Report

Assess what the board or the risk committee needs from you this period: the KPIs against plan, the exceptions, the decisions requested and the material risks. The document builds from what you state.

Crisis Decision Simulation

Crisis Decision

Assess how you decide, escalate and communicate when the top risk on your register arrives with incomplete and conflicting information. A trade-off arrives before the end.

Scores Pace, Framing, Escalation Decision, Trade-offs, Communication.

Presentation Under Pressure Simulation

Presentation Under Pressure

Assess how you defend the register and the board report to a board member who has already formed a view. The questions press where the evidence is weakest.

Scores Lead Argument, Evidence Handling, Question Response, Poise.

Renatus scores

Every simulation returns dimension scores from 0 to 100 and an overall score that is the mean. Strong is 70 and above, Developing is 30 to 69, Emerging is below 30. Each dimension score is anchored to a published rubric and tied to a moment in the scene. Every report carries what worked, the risk signals, strengths, development areas, blind spots only where evidenced, a recommended focus with a first step and a thirty-day success signal, and an intelligence brief. Both simulations also show how each dimension compares with a reference benchmark for the participant's level. The four research reports are not scored; the confidence rating on every section is Ren's confidence in its sources, never a judgement of the leader. Board Report is not scored; a further run in a later period is a new document, dated, to set beside the last.

Attempts

Every attempt on a room is scored on the same dimensions. The report then shows the trajectory across all attempts, dimension by dimension, and the cover names the attempt. This is the measure the program is built on. A rising line is improvement. A falling line, on a room a participant has done well before, is the earliest warning a manager will get.

What the scores rest on

For your own reference. Crisis Decision: Boyd's OODA loop, Klein's recognition-primed decision-making, and crisis communication discipline. Presentation Under Pressure: the Minto pyramid principle and Aristotelian rhetoric after Heinrichs. Board Report is a document, not a score; it is built on plan-versus-actual discipline, exception-based reporting and decision-driven boards. The four research reports carry no framework; each rests on the named, cited sources in the report. Every scored report names its own at the foot.

What Ren does not score

Whether a risk on the register is real, whether the register is complete, whether a mitigation will work, the conduct of the leader, or the outcome of a live incident. The research reports rate their sources, not the leader. The scores inform the development conversation and the next attempt. They are never an appraisal input.

Your notes from the one-to-ones

You are not marking. One line per room per leader is enough:

RoomWhat to write down
1The risk they thought was covered, and whether the report agreed
2The rule they would brief the board on first, and its signal
3The single source they had not named before the report
4The country they are most exposed to, and the focus for the second half
5The decision requested they expect to be refused, and the count of new rows
6When they escalated and why then
7The question they least want in the real room

Ways to run it

  • Assigned (this guide). Seven rooms in order, at the leader's own pace. The order matters and the pace is theirs. The manager's only task is to read the reports and the register before the regular one-to-one.
  • Onboarding. For a leader newly appointed to a unit: the same seven rooms, in the same order, one room a working day if the first days allow.
  • Ongoing. After the first cycle, one room a month per leader, the room their register or their reports point to, with the reports re-run as the world moves. This is the mode the program is built for. Section 8 lists the rooms to add.
  • Facilitator-led. A risk lead or a facilitator runs the same seven rooms as a cohort, with a debrief after each of rooms 1 to 5 and after room 7. Section 8 gives the agendas. About ninety minutes for each.
  • Run for a client. A facilitator, adviser or consultant owns the program in My Programs, invites the client's leaders, and reports to the client on the unit's exposure and its leaders' progression. Section 8 says what to deliver and when.

The rooms are the same in all five. Only the pace and who reads the results change.

Adapting the program

Running it as a facilitator

The same seven rooms, with the cohort brought together after each of rooms 1 to 5 and after room 7. Four forty-five-minute register debriefs, two sixty-minute debriefs, and a ten-minute challenge per leader after room 7. About ninety minutes for each. Where the cohort covers one unit, keep one register and merge rows as they come.

Debrief one, after room 1

Forty-five minutes. - Fifteen minutes: each leader reads out their five materialising risks with the confidence rating on each. - Thirty minutes: build or merge the register rows as they speak. Nothing is removed until room 5.

Debrief two, after room 2

Forty-five minutes. - Twenty minutes: the regulatory rows, with the signal on each, and the rows from room 1 that now carry a date. - Twenty-five minutes: where a compliance lead disagrees with a finding, both views recorded.

Debrief three, after room 3

Forty-five minutes. - Twenty-five minutes: the single-source exposures, one leader at a time, each with an owner. - Twenty minutes: the one supply risk each leader would have said was covered.

Debrief four, after room 4

Forty-five minutes. - Fifteen minutes: the political rows, country by country. - Thirty minutes: the register as a whole. Each leader flags their top ten and the focus they carry into the second half.

Debrief five, after room 5

Sixty minutes. - Twenty minutes: rate the full register row by row. Where Ren's source and the room's judgement differ, record both. - Fifteen minutes: cut to a watched list. High on either axis or already materialising stays active; the rest moves to the watch list with a signal and a review date. - Fifteen minutes: the board reports. Where two leaders named different material risks, ask why. - Ten minutes: compare with the old register.

Debrief six, after room 7

Sixty minutes. - Fifteen minutes: the team's Crisis Decision scores by dimension, without names. Name the dimension the cohort found hardest. - Fifteen minutes: each leader, in two minutes: the decision they would change, and what changed on the register. - Twenty minutes: the Presentation Under Pressure runs: which question landed hardest. - Ten minutes: set the ongoing plan: one room a month per leader, the research rooms re-run each quarter, one debrief a quarter.

Challenge the register, after room 7, ten minutes per leader

Take the leader's board report and ask the three hardest questions a board member would: the source behind one rating, the row with the weakest owner, and the risk that is not on it. Score nothing.

Running it for a client

A facilitator, adviser or consultant runs the program from their own My Programs. Start it from the template, invite the client's leaders by email, and upload the client's own context. From then on the rooms run in the leaders' own time, and Renatus shows you each report as it completes, a Ren summary per leader, the trajectories and the team report. The registers sit in the client's own tool; ask for read access.

What to deliver to the client: - After room 3. Each leader's three reports and register so far, and the Ren summary across the three rooms: the materialising risks, the rules with a date attached, the single sources. - After room 7. The signed registers with the count against the old one, the board reports, the team report, the trajectories, and the ongoing plan. - Quarterly thereafter. The research rooms re-run and read against the register for what moved in the world, the trajectories read per leader, and your recommendation for the next quarter's rooms from the library below.

Tell the client at the outset what the reports are for. They inform development conversations and the next attempt. They are never an appraisal input.

Other ways to run it

Onboarding

One room a working day, in the same order, for a leader newly appointed to a unit.

Country heads and single-country units

Keep every room; in Geopolitical Risks, name the countries of the unit's top suppliers and customers as well.

A services unit with no physical supply chain

Keep every room. Run Supply Chain Risk on the inputs the unit does depend on: data providers, cloud platforms, a contractor base, a licensed technology.

Ongoing

One room a month per leader, the room their register or their reports point to, with the research rooms re-run each quarter so the register never ages past ninety days. Board Report is re-run each period, so the documents form a dated series.

As the months go on, add rooms from the library so the monthly attempt has somewhere to go beyond the first seven:

RoomWhat it adds for this cohortWhen to use it
ESG & Reputation (research report)Climate exposure, governance weaknesses, social risks and controversy flags for the sectorWhen a controversy hits a peer
Country Intelligence (research report)The complete picture on one country: economy, politics, infrastructure, trade, regulation and outlookWhen one country dominates the register
Issue Briefing (research report)A sourced briefing on one issue, rule or event that has landedWhen a signal on the register fires
Problem Analysis (document)The top risk thought through: what it is costing, why it is happening, the options and a recommended pathWhen a mitigation needs deciding
Crisis ManagementLeading the organisational incident as it scales, at the leader's crisis role levelOn the risk that would become an incident

Keep the order. The landscape comes before the close-ups, the register before the report, and the rehearsals last because they carry everything before them.

Set-up before the first room

Allow about an hour.

  1. Start the program from the template in My Programs. The seven rooms are already in order.
  2. Upload the organisation's context. The risk policy, the template the board or the risk committee reports risk in, and the existing register, where each exists. Then add three lines per unit: what it does, where it operates, and what it depends on. Where the cohort covers several units, write them into session memory for each leader instead.
  3. Add two notes. On room 5, which board or committee the report goes to, who sits on it, and the period. On room 7, the audience to rehearse for.
  4. Give each leader an empty register. Ten columns: risk, source report, likelihood, impact, already materialising, signal to watch, owner, mitigation, confidence, date added. Renatus produces the reports; the register is the leader's judgement on them.
  5. Invite the leaders. They get an email and a login. Nothing to install. Tell them the scores inform their development conversation and are never an appraisal input.

Everything else comes with the program.

At a glance

#RoomManager, before the one-to-one
1Risk AssessmentRead the materialising risks and the confidence ratings; read the register's first rows
2Regulatory RiskRead the pending legislation and the enforcement trends; check which rows from room 1 now carry a date
3Supply Chain RiskRead the single-source exposures; check every one is a register row with an owner
4Geopolitical RisksRead what is changing, country by country; read the register as a whole and the leader's top ten
5Board ReportRead Material Risks and Decisions Requested; check each material risk matches its register row
6Crisis DecisionRead Escalation Decision and Communication
7Presentation Under PressureRead Question Response and Poise; read the team report; set the ongoing plan

Reading a research report well takes longer than Ren took to write it. Board Report takes about an hour with the register and the numbers to hand. A simulation runs until the scene closes, then the report takes about five minutes to write.

What you need

  • The program in My Programs, started from the template.
  • The organisation's risk policy, reporting template and existing register uploaded at set-up, and three lines per unit.
  • Notes on room 5 (the board or committee, its members and the period) and room 7 (the audience).
  • An empty ten-column register per leader, in the tool the unit reports risk in.
  • The period's KPIs and numbers to hand for room 5.
  • Ten minutes before each one-to-one to open My Programs.
  • Headsets or a quiet space for the voice room, room 7.
Meet Ren
Your AI strategist
We use essential cookies to keep you logged in and protect your session. Our only optional cookies remember your language preference — we don't track you or collect unnecessary data. Cookie Policy · Privacy Policy

Cookie Settings

Choose which cookies you'd like to allow. Essential cookies cannot be disabled as they are required for the platform to function.

Essential Cookies Always Active
Login sessions, security tokens, and consent preferences. Required for the platform to work.
Functional Cookies
Language preferences, display settings, and last accessed report. Disabling may affect personalisation.
Analytics Cookies
Aggregated, anonymised usage data to help improve the platform. Never used to identify you personally.